Licensed & insured

AL #06957

Mon–Sat 8am–5pm

Electrical panel upgrades

And fuse box replacement.

If your house still has a fuse box, a 100-amp panel from the seventies, or a brand that insurers now refuse to cover, this is the job that fixes several problems at once.

Before-and-after view of electrical panels: tangled, worn breakers on the left versus a cleaner, newly wired panel on the right; JB Electric.
Licensed & insured
Alabama license #06957
No deposit, ever
You pay when the job is done.
2-hour window
Late? The $95 diagnostic is on us.
32 years in the trade
Master electrician

What we charge

Anything outside these is quoted after a load calculation. Either way the number is written down and agreed before we start.

$1,500
Inside sub-panel replacement
Permit and inspection included.
$3,500
200-amp outside service
Rebuilt completely.
$3,500
Power pole
Permit included.
The permit fee is inside the price, not added afterwards.
Alabama Power is handled. We coordinate the disconnect and reconnect.
No deposit. You pay when the work is done. Financing is available.

When a panel actually needs replacing

Not every old panel is dangerous, and we’ll tell you if yours is fine. The ones that genuinely need to go:

Fuse boxes

Still common in Midtown and older Saraland houses. Not inherently unsafe, but unexpandable, and most insurers now price against them.

Federal Pacific Stab-Lok and Zinsco panels

Documented failure to trip under fault. Insurers and home inspectors both flag these on sight.

100-amp service feeding a modern house

Add central air, a range, a dryer and a car charger and you’re past what the service can carry.

Panels that are physically full

Including any with tandem breakers stuffed into slots not rated for them.

Corrosion

We’re eight miles from salt water, and it shows inside meter bases and panel enclosures.

Technician in a red shirt repairs an outdoor electrical meter and wiring on a wooden utility pole beside a weathered building, trees, and yard.

What the job involves

A panel change is a permitted job, and it means a power cut for most of a day. Here’s what we do:

  • Pull the permit
  • Coordinate the disconnect and reconnect with Alabama Power
  • Replace the panel, and usually the service entrance conductors and meter base
  • Install a proper grounding electrode system
  • Label every circuit legibly
  • Meet the inspector ourselves

You get the permit paperwork and the inspection sign-off.

Why the labeling matters

Most panels we open have a directory card that’s either blank or forty years out of date. Every circuit gets tested and hand-labelled on the way out.

That’s the difference between finding the right breaker in ten seconds during an emergency and pulling the whole house down to find it.

new panel good shape Open gray electrical breaker panel with rows of labeled switches, dense white and black wiring, and exposed terminals in a utility room.
A finished panel, every circuit labelled. Our own work.

FAQs about panel upgrades

Still not sure? Call (251) 550-9813, Monday to Saturday, 8 to 5.

How long does the power stay off?

Plan on most of a working day for a straight panel change. If the service entrance and meter base are being replaced too, it’s a full day, and the utility’s reconnect timing is the part we don’t fully control. We’ll give you a realistic window before we book it.

Do I need a full service upgrade or just a new panel?

Different jobs. A panel swap replaces the box and breakers on the same service size. A service upgrade increases the amperage, which means new conductors, new meter base and utility involvement. We’ll do a load calculation and tell you which one your house actually needs.

Will my insurer care?

Often, yes, particularly with Federal Pacific, Zinsco and fuse boxes. Several carriers writing in Mobile County either surcharge or decline these. Worth a call to your agent before you decide, since the premium change sometimes covers a chunk of the job.

Is financing available?

Yes, through Affirm, subject to their approval. See our financing page for how it works.

Do you want a deposit up front?

No. We don’t take deposits on any job, including panel and service work. You pay when it’s finished.